31, Jan 2026
Bustleton Second Floor Bedrooms Renovations

For this job in Bustleton we had a lot of renovating to do on the second floor, in the three bedrooms and hallway, of a townhouse.

First we had to paint the bedrooms and hallway, entry and closet doors.

Then we had to rip up all the carpet and in the master we had to tear up the subfloor to plane down some of the framing as there was a huge hump in the middle of the floor.

We started the flooring in the far corner of the master and ran it through the entire upstairs.

We then installed new 5 1/4 baseboard throughout the floor and replaced a few light fixtures and electrical cover plates.

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Posts

Huge Shiplap TV, Fireplace and Mantel Wall

For this job we added a mitered shiplap bump out wall in the living room. First we had to measure…

Basement Shiplap TV Wall

For this job we installed a bump out shiplap wall in a basement. We cut the drywall out and framed…

Warminster Porch Room Revonation

In Warminster we were hired to renovate a porch room in the backyard. We replaced the concrete ledges with PVC…